Optimized scheduling method of printing and dyeing production process based on mathematical model
Production scheduling is an important means of improving production efficiency,optimize the allocation of resources,its role in the printing and dyeing production process is particularly critical.However,due to the particularity of printing and dyeing production,including the complexity of the production process,the close connection between process and the limitation of production resources,the traditional production scheduling method has been difficult to meet the modern printing and dyeing enterprises demand for efficient and flexible production scheduling.Based on mixed integer linear programming(MILP)model,an efficient and feasible optimal scheduling scheme was provided for printing and dyeing production process by constructing an objective function that comprehensively considered production time,cost and efficiency,clarifying the deci-sion variables and constraints faced by production scheduling,and adopting mathematical modeling and algo-rithm solving techniques.
MILPprinting and dyeing productionoptimal scheduling