Analysis and Discussion of Cold Preparation of Combustion Driven Compressor Unit
A long distance natural gas pipeline carries the task of transporting natural gas clean energy for western regional cities,and there are natural gas transmission and distribution stations and natural gas booster stations along the line.As the main power equipment of compressor station,gas turbine provides energy for natural gas pressurization,and is also the equipment with the largest energy consumption.Research on cold standby energy consumption of combustion compressor unit is of great significance to reduce energy consumption and clean production.In recent years,due to the production reduction and process adjustment of upstream gas fields,the annual unit operation time of an intermediate compressor station is less.In order to reasonably reduce energy consumption,cold preparation of the unit has better economic benefits and production significance.