摘要
在分析湿法炼锌铅银渣的主要成分与化学物相的基础上,考察了温度、浸出时间、氯酸钠浓度、酸度等对铅银渣中铅银含量及浸出率的影响,确定了氯化浸出最优工艺条件为:氯化钠浓度300 g/L、氯化钙浓度50 g/L、初始盐酸0.4 mol/L、浸出温度85℃、浸出时间2.5h、液固比8,在该条件下铅银渣中铅、银的浸出率分别可达94.43%和91.48%,渣中铅含量为0.9%,银含量84.4 g/t.
Abstract
Based on analysis of composition and chemical phases,effects of temperature,leaching time,sodium chlorate concentration,and acidity on lead and silver extraction from lead-silver residue produced in hydrometallurgical zinc refinery were investigsted.The results show that leaching ratio of lead and silver is 94.43% and 91.48% respectively,and lead and silver content in residue is 0.9% and 84.4 g/t respectively under the optimum conditions including NaCl concentration of 300 g/L,CaCl2 concentration of 50 g/L,initial HCl concentration of 0.4 mol/L,leaching temperature of 85 ℃,leaching time of 2.5h,and L/S=8.