有色矿冶2024,Vol.40Issue(2) :16-19.

某金矿竖井提升系统改造设计

Transformation Design of the Vertical Shaft Lifting for a Gold Mine

王悦
有色矿冶2024,Vol.40Issue(2) :16-19.

某金矿竖井提升系统改造设计

Transformation Design of the Vertical Shaft Lifting for a Gold Mine

王悦1
扫码查看

作者信息

  • 1. 沈阳有色冶金设计研究院有限公司,辽宁 沈阳 110003
  • 折叠

摘要

通过对某金矿提升系统现状的研究,提出了 2 个可行的技术方案,对两个方案在技术上和经济上进行较为详细的比较,分析其各自的优缺点,最后推荐新建一条混合井兼具主提升系统和辅助提升系统功能,改造原有竖井作为辅助提升系统的一部分.并且阐述了推荐方案中提升系统设备选型和提升系统辅助设施设计思路,为以后相似工程设计提供借鉴.

Abstract

Through the research on the current situation of a gold mine's lifting system,two feasible technical schemes are proposed,the two schemes were compared in detail in terms of technology and economy,and their respective advantages and disadvantages were ana-lyzed.Finally,a new mixed shaft was recommended with both the main lifting system and the auxiliary lifting system functions,and the original shaft is reformed as a part of the auxiliary lifting system.The selection of lifting system equipment and the design of lifting system auxiliary facilities in the recommended scheme were also discussed to provide reference for the future similar engineering.

关键词

提升系统/混合井/主提升系统/辅助提升系统

Key words

lifting system/mixed shaft/main lifting system/auxiliary lifting system

引用本文复制引用

出版年

2024
有色矿冶
辽宁省有色金属学会

有色矿冶

影响因子:0.251
ISSN:1007-967X
参考文献量3
段落导航相关论文