首页|氯盐体系浸出铜阳极泥分银渣中铅银的工艺研究

氯盐体系浸出铜阳极泥分银渣中铅银的工艺研究

扫码查看
研究了在 NaCl-CaCl2-HCl氯盐体系下,从铜阳极泥分银渣中浸出铅和银的工艺.通过正交试验,探索 NaCl初始浓度、HCl初始浓度、液固体积质量比,反应温度和反应时间对铜阳极泥分银渣中铅和银回收的影响.结果表明:氯盐体系下,铜阳极泥分银渣铅和银浸出最佳工艺条件为:NaCl初始浓度 260 g·L-1、HCl初始浓度 1.0 mol·L-1、液固体积质量比 9∶1,反应温度 80℃和反应时间 1.5 h.在最佳工艺条件基础上,探索得出最佳CaCl2 用量为理论用量的 2 倍.经最佳工艺条件验证实验可得,铅和银的平均浸出率分别为 98.24%和 97.73%.各组数据表现稳定,波动较小,该氯盐体系浸出铜阳极泥分银渣中的铅和银效果较好.
Leaching Lead and Silver from Silver Separation Slag of Copper Anode Slime Based on Chloride Salt System
The process of leaching lead and silver from silver residue of copper anode mud in the NaCl-CaCl2-HCl chloride salt sys-tem was studied.Through orthogonal experiments,the effects of initial concentration of NaCl,initial concentration of HCl,liquid-solid volume mass ratio,reaction temperature and reaction time on the recovery of lead and silver from silver slag in copper anode mud separation were explored,the results showed that under the chloride salt system,the optimal process conditions for leaching sil-ver slag,lead,and silver from copper anode mud were initial NaCl concentration of 260 g·L-1,initial HCl concentration of 1.0 mol·L-1,liquid-solid volume to mass ratio of 9∶1,reaction temperature of 80℃,and reaction time of 1.5 h.Based on the optimal pro-cess conditions,the optimal amount of CaCl2 was explored to be twice the theoretical amount.After verifying the optimal process conditions,the average leaching rates of lead and silver were 98.24%and 97.73%,respectively.The performance of each group of data is stable with small fluctuations,and the chloride salt system has a good effect on leaching lead and silver from silver residue.

chloride salt systemcopper anode mudsilver slaglead and silver recovery

阙旺东、邓成虎、王达之、王京慧

展开 >

江西铜业股份有限公司 贵溪冶炼厂,江西 贵溪 335424

氯盐体系 铜阳极泥 分银渣 铅银回收

2024

有色矿冶
辽宁省有色金属学会

有色矿冶

影响因子:0.251
ISSN:1007-967X
年,卷(期):2024.40(5)