首页|Stress tensor determination by modified hydraulic tests on pre-existing fractures:Method and stress constraints
Stress tensor determination by modified hydraulic tests on pre-existing fractures:Method and stress constraints
扫码查看
点击上方二维码区域,可以放大扫码查看
原文链接
万方数据
维普
The hydraulic testing of pre-existing fractures(HTPF)is one of the most promising in situ stress mea-surement methods,particularly for three-dimensional stress tensor determination.However,the stress tensor determination based on the HTPF method requires at least six tests or a minimum of 14-15 tests(under different conditions)for reliable results.In this study,we modified the HTPF method by considering the shear stress on each pre-existing fracture,which increased the number of equations for the stress tensor determination and decreased the number of tests required.Different shear stresses were attributed to different fractures by random sampling;therefore,the stress tensors were obtained by searching for the optimal solution using the least squares criterion based on the Monte Carlo method.Thereafter,we constrained the stress tensor based on the tensile strength criterion,compressive strength criterion,and vertical stress constraints.The inverted stress tensors were presented and analyzed based on the tensorial nature of the stress using the Euclidean mean stress tensor.Two stress-measurement campaigns in Weifang(Shandong Province,China)and Mercantour road tunnel(France)were imple-mented to highlight the validity and efficiency of the modified HTPF(M-HTPF)method.The results showed that the M-HTPF method can be applied for stress tensor inversion using only three to four tests on pre-existing fractures,neglecting the stress gradient.The inversion results were confined to relatively small distribution dispersions and were significantly reliable and stable due to the shear stresses on the fractures and the stress constraints employed.The M-HTPF method is highly feasible and efficient for complete stress tensor determination in a single borehole.
Stress tensorHydraulic tests on pre-existing fracturesMean stressStress constraintHydraulic fracturing
Guiyun Gao、Chenghu Wang、Ke Gao
展开 >
National Institute of Natural Hazards,Ministry of Emergency Management of China,Beijing,100085,China
Beijing Engineering Research Center of Earthquake Observation,Beijing,100085,China
Key Laboratory of Compound and Chained Natural Hazards Dynamics,Ministry of Emergency Management of China,Beijing,100085,China
Department of Earth and Space Sciences,Southern University of Science and Technology,Shenzhen,518055,China
展开 >
国家自然科学基金National Institute of Natural Hazards,Ministry of Emergency Management of China