首页|Development of high-power microwave mechanical integrated continuous mining device

Development of high-power microwave mechanical integrated continuous mining device

扫码查看
This article introduces a high-power microwave mechanical integrated continuous mining device,which can achieve synchronous cutting of hard rocks by microwave and machinery.The device includes a cutting system,a rotary translation system,a loading system,a high-power microwave system,and a control and monitoring system.The technology of"master-slave follow-up"disc cutter alternating side cutting of rock was proposed,which could improve the effectiveness of rock breaking.The integrated structure of a microwave-cut system was then proposed,and synchronous motion of the microwave-cut system and adjustment of the loading system could be realized.The automatic adjustment technology of the microwave working distance was developed to dynamically control the optimal microwave working distance.The basic functions of the equipment were verified by tests.By comparing the two types of disk cutters,it is found that the master-slave follow-up disk cutter can improve significantly the dust removal effect and rock breaking efficiency in rock breaking process versus the conventional large disc cutter.Cutting tests of slate with or without microwave were conducted using a master-slave follow-up disk cutter.The results show that the cutting patterns of slates change from intermittent chunks(without microwave irradiation)to persistent debris(with microwave irradiation),and the cutting speed is significantly improved(170%).The development of the device provides a scientific basis for changing the conventional mining technology of metal mines and realizing the mechanical continuous mining in hard metal mines.

Hard metal mineMicrowave machineryContinuous miningMaster-slave follow-up disc cutter

Xia-Ting Feng、Feng Lin、Jiuyu Zhang、Chengxiang Yang、Yuntan Ao、Tianyang Tong

展开 >

Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines,Northeastern University,Shenyang,110819,China

Key Laboratory of Liaoning Province on Deep Engineering and Intelligent Technology,Northeastern University,Shenyang,110819,China

National Natural Science Foundation of ChinaLiaoning Provincial Science and Technology Program

418278062022JH2/101300109

2024

岩石力学与岩土工程学报(英文版)
中国科学院武汉岩土力学所中国岩石力学与工程学会武汉大学

岩石力学与岩土工程学报(英文版)

CSTPCD
影响因子:0.404
ISSN:1674-7755
年,卷(期):2024.16(9)