According to the production and operation of the cyclone converter in a certain smelter,combined with the serious erosion of refractory bricks in the reaction shaft water cooling element,settler slag line area,and the top of the uptake shaft found during cold repair,this paper introduces the structural optimization measures for the reaction shaft,settler and uptake shaft during the first cold repair of the cyclone converter in the smelter,and puts forward further optimization measures that can be earried out in the future for the cyclone converter in the smelter.
关键词
旋浮吹炼炉/反应塔/沉淀池/上升烟道/铜水套
Key words
cyclone converter/reaction shaft/settler/uptake shaft/copper cooling element