首页|横河DCS系统在李家沟锂矿中的应用

横河DCS系统在李家沟锂矿中的应用

扫码查看
李家沟锂辉石矿采选项目工艺管道落差大、距离短,光纤露天铺设故障率高,检测数据和联锁也无法得到保障.为保证厂方能够准确掌握仪表数据、阀门及设备状态,确保工艺操作的可靠性,采用横河的CENTUM VP系统,在山上的磨矿控制室和山下的浮选控制室分别布置了互为冗余且带完整数据库存储的工程师站+数据服务器,并通过采取配置两个主控器间通信、三网分别端口聚合、通信心跳检测、操作可视化等多种方法,保证了原矿自流下山管道及尾矿上山管道的正常运行.
Application of Yokogawa DCS System in Lijiagou Spodumene Mine Project
The process pipeline of the Lijiagou Spodumene ore mining & mineral processing project has a large drop and a short distance,.The failure rate of the optical fibre is high when it is laid in the open air,and the detection data and interlocking cannot be guaranteed.Yokogawa's CENTUM VP system was adopted to ensure that the instrument data and valves & equipment status can be accurately obtained to ensure the reliability of process operation.Mutually redundant engineer stations and data servers with complete database storage are arranged in the grinding control room up in the mine and the flotation control room down the mine,respectively.Furthermore,the normal operation of the raw ore upward pipeline and tailings downward pipeline by gravity can be ensured by adopting a variety of methods such as communication configuration between the two master controllers,three-network ports aggregation,communication heartbeats detection,and operation visualization.

mining & mineral processing projectprocess pipelineYokogawa DCS systemredundancy configurationlink aggregation technology

周忠光、陈荣祥、鱼智华

展开 >

江西瑞林电气自动化有限公司,江西南昌 330038

四川德鑫矿业资源有限公司,四川阿坝金川 624101

横河电机(中国)有限公司,陕西西安 710077

采选项目 工艺管道 横河DCS系统 冗余配置 链路聚合技术

2024

有色冶金设计与研究
中国瑞林工程技术有限公司

有色冶金设计与研究

影响因子:0.414
ISSN:1004-4345
年,卷(期):2024.45(6)