中国有色冶金2024,Vol.53Issue(3) :57-63.DOI:10.19612/j.cnki.cn11-5066/tf.2024.03.007

高锌含量铅锌氧化渣直接还原试验研究

Experimental study on direct reduction of lead-zinc oxide slag with high zinc oxide content

欧阳坤 苏飞 豆志河 刘永富
中国有色冶金2024,Vol.53Issue(3) :57-63.DOI:10.19612/j.cnki.cn11-5066/tf.2024.03.007

高锌含量铅锌氧化渣直接还原试验研究

Experimental study on direct reduction of lead-zinc oxide slag with high zinc oxide content

欧阳坤 1苏飞 1豆志河 2刘永富1
扫码查看

作者信息

  • 1. 深圳市中金岭南有色金属股份有限公司 韶关冶炼厂,广东 韶关 512000
  • 2. 东北大学 冶金学院,辽宁 沈阳 110819
  • 折叠

摘要

铅锌氧化渣熔融还原是得到金属铅和锌的重要步骤,但氧化渣中锌含量升高和铅含量降低会导致熔化温度增加,使得还原工艺条件发生较大变化.本文对高锌含量铅锌渣(Zn≈25%)的还原工艺条件和渣型制度进行了研究,主要考察了还原煤量、还原温度、还原时间、Fe/SiO2、CaO/SiO2 对铅锌氧化渣中Pb、Zn、Cu回收率的影响.试验结果表明,铅锌渣Pb、Zn、Cu金属回收率随着还原煤量、还原温度、还原时间的增加而增加,但过高的煤比和还原温度不利于Pb、Cu回收率的提高;铅锌渣Pb、Zn、Cu金属回收率随着Fe/SiO2和CaO/SiO2的增加而增加,但Fe/SiO2增加至0.78,CaO/SiO2 增加至0.8 时,继续增加Fe/SiO2和CaO/SiO2将降低Pb、Zn、Cu金属回收率.试验用铅锌渣的适宜还原条件为煤比1.2~1.4、还原温度1623~1673 K、还原时间90~120 min、Fe/SiO2=0.78~1.17,CaO/SiO2=0.5~0.8.在上述工艺条件下,铅锌氧化渣中Pb、Zn、Cu回收率分别可达84.01%、94.51%、85.8%以上.

Abstract

Lead and zinc oxide slag with high zinc content was synthesized at high temperature using high lead slag as raw material,and anthracite was added as reducing agent for direct reduction experiment.The experiment studied the effects of reducing coal amount,reducing temperature,reducing time,Fe/SiO2,CaO/SiO2 on the recovery rates of Pb,Zn,and Cu in lead and zinc oxide slag.The experimental results showed that the recovery rates of Pb,Zn,and Cu of lead and zinc oxide slag increased with the increase of reduction coal amount,reduction temperature,and reduction time.However,excessive coal ratio and reduction temperature are not conducive to the improvement of Pb and Cu recovery rates;The recovery rates of Pb,Zn,and Cu of lead and zinc oxide slag increased with the increase of Fe/SiO2 and CaO/SiO2.However,as Fe/SiO2 increased to 0.78 and CaO/SiO2 increased to 0.8,continuing to increase Fe/SiO2 and CaO/SiO2 would reduce the recovery rates of Pb,Zn,and Cu.The suitable conditions for the reduction of lead and zinc oxide slag were:coal ratio of 1.2~1.4,reduction temperature of 1 623~1 673 K,reduction time of 90~120 minutes,Fe/SiO2=0.78~1.17,CaO/SiO2=0.5~0.8.Under the above process conditions,the recovery rates of Pb,Zn,and Cu in lead and zinc oxide slag could reach 84.01%,94.51%,and 85.8%,respectively.

关键词

铅锌混合矿/高锌含量铅锌渣/直接还原/金属回收率/还原工艺/渣型制度

Key words

lead and zinc mixed concentrate/lead and zinc slag with high zinc oxide content/direct reduction/metal recovery rate/reduction process/slag type system

引用本文复制引用

基金项目

广东省重点领域研发计划(2022B0111130002)

出版年

2024
中国有色冶金
中国有色工程有限公司

中国有色冶金

北大核心
影响因子:0.369
ISSN:1672-6103
参考文献量8
段落导航相关论文