首页|隧道施工期掌子面岩体结构信息最佳获取时机探究

隧道施工期掌子面岩体结构信息最佳获取时机探究

扫码查看
隧道施工期快速获取岩体结构面信息对于优化后续施工策略、避免工程岩体灾害至关重要.针对于此,本研究提出了隧道施工期掌子面岩体结构信息最佳获取时机.通过归纳总结国内外针对于岩体信息获取的相关研究,结合鲁山隧道施工期实际情况,分析施工期岩体信息获取质量的影响因素及最佳获取时机的大致范围;在鲁山隧道施工现场各断面针对呼吸性粉尘浓度和全尘浓度进行试验,通过在施工现场进行多次粉尘试验,探究掌子面岩体信息最佳获取时机.结果表明,最佳的获取时机为立架作业前;综合考虑粉尘试验各测点试验数据,在考虑可吸入粉尘因素时,立架前也是工程人员进行掌子面力学特性测试与隧道内各处衬砌检测的最佳时机.本研究所确定的最佳获取时机对于提升岩体信息获取精度、指导后续施工方案至关重要.
Exploration of the best time to obtain rock structure information on the palm face during tunnel construction
Rapid acquisition of rock structure information during tunnel construction is crucial for optimizing subsequent construction strategies and avoiding engineering rock disasters.In this regard,this study proposes the best time to obtain rock structure information on the tunnel face during the construction period.By summarizing relevant studies on rock information acquisition locally and abroad and combining them with the actual situation during the construction of the Lushan Tunnel,this study analyzed the factors affecting the quality of rock information acquisition during the construction period and the approximate range of the optimal timing of acquisition.We also conducted experiments on the concentration of respiratory dust and the concentration of total dust on each section of the Lushan Tunnel construction site and explored the optimal timing of acquiring rock information on the tunnel face by conducting several dust experiments at the construction site.The results showed that the best time to obtain information was before the erection of the steel arch,which was also the best time for the engineers to conduct mechanical characterization of the tunnel face and the lining inspection of the tunnel.The optimal acquisition timing identified in this study is crucial for improving the accuracy of rock information acquisition and guiding subsequent construction programs.

Engineering geologyEngineering surveysTunnelingEnvironmental testingDust testing

闫志强、姜枫、贺鹏、王刚、麻正虎、杨传馨、郭伟东、赵瑞杰

展开 >

Department.of Civil Engineering,Shandong University of Science and Technology,Qingdao 266590,China

山东科技大学土木工程与建筑学院,青岛 266590

福建工业大学土木工程学院,福州,350118

山东大学齐鲁交通学院,济南 250012

展开 >

工程地质 工程测量 隧道施工 环境检测 粉尘试验

2024

应用地球物理(英文版)
中国地球物理学会

应用地球物理(英文版)

影响因子:1.01
ISSN:1672-7975
年,卷(期):2024.21(4)