Discussion on several problems of PW and WFI system design
according to the characteristics of pharmaceutical water and GMP regulations,several problems such as water generation,storage & distribution,POU settings are discussed in the design of PW and WFI system.And specific example schematic diagrams are attached for illustration.
GMP regulationspurified waterwater for injectionpharmaceutical waterwater generationwater storage &distributionpoints of use