基于海洋工程平台项目特点,研究物资分类、物资编码和物资批次编码等关键技术,引入批次管理方法.按批次阶段形成亚批次清单(Bill of Lots,BOL),建立物资追溯管理模型,为海洋工程平台项目实现产品全生命周期内的物资追溯管理提供理论依据.
Batch Management Method of Materials Traceability Management for Offshore Engineering Platform Project
Based on the characteristics of offshore engineering platform project,the key technologies such as materials classification,materials coding,and materials batch coding are studied,and the batch management method is introduced.Bill of Lots (BOL) is formed according to the batch phases,and the materials traceability management model is established,which can provide theoretical basis for the offshore engineering platform project to realize the materials traceability management in the whole product life cycle.