Optimization Design of Structure Type of Upending Fixture for Extra-Large Diameter Pile Foundation of Offshore Wind Turbine Generator
In view of the upending fixture for extra-large diameter pile foundation of offshore wind turbine generator,based on the structure safety consideration,combined with the existing problems of original upending fixture,the optimization design of structure type is made,and the finite element analysis is conducted.The results show that the structure strength of optimized upending fixture can meet the specification requirements so as to greatly improve the structure safety,and be hoisted in position without leveling so as to effectively improving the upending efficiency.