Control Automatic Calibration of Substation Based on Enhanced Natural Language Processing
With the modernization of equip ment management system requirements continue to sound landing,a key to the control technology as the grid grass-roots operation and maintenance of the first line of cost reduction,explore the digital reform and the"two alternatives"construction of an important hand,how to safely and orderly ensure that the application of a key to the control technology on-line is the bottleneck of today's main network operation and inspection business.At present,one-key sequence control is in accordance with the State Grid Corporation's principle of"one transformation,one acceptance,one on-line",and the most critical link in the acceptance of traditional one-key sequence control is the acceptance of the smooth control operation ticket,which is based on the combination of the mode of"one-key command from the monitoring system and manual inspection of the actual equipment displacement".The most critical part of traditional one-key sequence control acceptance is the acceptance of the operation ticket,which is mainly based on the combination of"one-key command from the monitoring system and manual checking of the actual transformer position of the equipment".Therefore,in order to improve the quality and efficiency of acceptance of one-key sequence control of substation,this paper proposes to carry out semantic recognition of one-key sequence control operation ticket and operation and maintenance typical operation ticket based on expert semantic recognition algorithm,and"1 to 1"traversing verification of the whole interval and data of the substation transformed by one-key sequence control,thus realizing the error checking,omission checking and error correcting under the precise matching,and achieving the goal of"one-key sequence control operation ticket without power outage".It realizes the non-stop,offline,intelligent and efficient acceptance of smooth control operation tickets,ensuring the safe and stable operation of the power grid after the application of one-key sequence control.
one-key sequence controlnatural language processingsafety calibrationone-key sequence control operation ticket acceptance