依托浙西南网架优化加强工程内悬浮外拉线抱杆组塔施工,提出使用单根Φ275 mm截面辅助抱杆起立Φ550 mm截面主抱杆的新方法,解决输电线路山区受地形限制主抱杆整体起立和人字辅助抱杆设置的难题.详细阐述了此方法的主要流程、现场布置、起立过程等步骤,以进一步提升主抱杆起立的效率和安全性.
Construction Method of Single Auxiliary Pole Standing Up Main Pole in Mountainous Area of Transmission Line
In this paper,based on the optimization of grid structure in southwest Zhejiang Province to strengthen the construction of suspended external pole group tower,a new method of using a single Φ275 mm section auxiliary pole standing up Φ550 mm section main pole is proposed to solve the problem of the overall standing up of the main pole and the setting of the herringbone auxiliary pole in the mountainous area of the transmission line limited by the terrain.The main flow,site layout and standing up process of this method are described in detail to further improve the efficiency and safety of the main pole standing up.

transmission lineauxiliary polemain pole stands up

陈浩、桑锦明、戴少江、祁林海

展开 >

江苏省送变电有限公司,江苏南京 210046

输电线路 辅助抱杆 主抱杆起立

2024

自动化应用
重庆西南信息有限公司

自动化应用

影响因子:0.156
ISSN:1674-778X
年,卷(期):2024.65(4)
  • 3