特高压变电站通常包含大量的设备、线缆和管道,其复杂程度高,难以直观理解.通过三维建模技术,可以将变电站的结构、设备和各组成部分以可视化的方式展示,模拟不同条件下的运行情况,采取相应的维护和优化措施.为此,研究基于智能管控系统和BIM的特高压变电站自动化三维建模方法,运用最小二乘法拟合计算进度与时间的关系曲线,通过智能管控系统管控变电站施工进度;采用BIM和三维激光扫描技术,根据激光传感器进行定位,运用相机获得变电站表面颜色信息,采集变电站点云数据关联场景;利用Bentley软件构建变电站自动化三维模型,采用逻辑节点合成变电站自动化系统的可视信息,实现特高压变电站自动化建模.结果表明,本文方法的均方根误差均小于20 mm,能够得到更高精度的模型,帮助运维人员更好地识别和定位变电站中存在的问题并采取相应的维护和优化措施.
3D Modeling of UHV Substation Automation Based on Intelligent Control System and BIM
UHV substations usually contain a large number of equipment,cables and pipelines,which are highly complex and difficult to understand intuitively.Through the 3D modeling technology,the structure,equipment and various components of the substation can be displayed in a visual way,and the operation situation under different conditions can be simulated,and the corresponding maintenance and optimization measures can be taken.To this end,the 3D modeling method of UHV substation automation based on intelligent control system and BIM is studied.The least squares method is used to fit the relationship curve between calculation progress and time,the construction progress of the substation is controlled through the intelligent control system,BIM and 3D laser scanning technology are used to locate according to the laser sensor,the camera is used to obtain the substation surface color information,and the substation point cloud data correlation scene is collected.The 3D model of substation automation is built by Bentley software,and the visual information of substation automation system is used to realize the UHV substation automation modeling.The results show that the root mean square error of the method is less than 20mm,which can get a higher precision model,which can help the operation and maintenance personnel to better identify and locate the problems in the substation,and take corresponding maintenance and optimization measures.

UHV substationintelligent control systemautomatic 3D modelingBIM technology

潘玉超

展开 >

南瑞集团(国网电力科学研究院)有限公司,江苏南京 240000

特高压变电站 智能管控系统 自动化三维建模 BIM技术