In response to the increasing frequency of long distance,high fluctuation and complex water transmission pipelines in recent years,in order to effectively reduce design workdays,the QC team has identified"high time consumption in water transmission pipeline layout design"as the main sticking point through current investigation and analysis.Based on the main sticking points and taking into account other factors,activity goals were set.Six end factors were identified through causal analysis,and two main factors,"complex water hammer simulation analysis process"and"incomplete pipeline path decision-making process",were confirmed using survey analysis method.In response to the two main factors,the group members analyzed and discussed in accordance with the method of"5W1H"and formulated countermeasures.These countermeasures have been effectively implemented,achieving and exceeding the target value.The design workday was steadily reduced,and the economic benefits were significant,which has certain promotion and application value.
关键词
QC方法/长距离高起伏/输水管线/设计工日
Key words
QC method/long distance high fluctuation/water transmission pipeline/design workday