Typical Protection Configuration and Operational Risk Management of Offshore Booster Station of 220kV Inner Bridge Wiring
Offshore wind power is an important strategic support for China to accelerate the clean and low-carbon energy transformation and build a new power system.This paper introduces the protection configuration of the inner bridge wiring method,a typical electrical wiring method of 220 kV offshore wind power farm booster station,summarizes the key circuits of tripping,long-hopping and start-up failure,and puts forward relevant operational risk management and control measures to provide reference for the acceptance of similar projects and the power outage maintenance of some equipment in the future.
offshore wind power farminner bridge wiringprotection configurationoperational risk management