Research on Global Reactive Power Optimization Scheduling Technology for Coal Mine Power Supply System
Based on the limitations of traditional reactive power optimization scheduling technology in coal mine power supply systems,a global reactive power optimization scheduling technology scheme is introduced.This technical solution,based on the standard genetic algorithm,arithmetic crossover and heuristic crossover ideas are introduced to form an improved multi population genetic algorithm.Taking a coal mine as a research case,combined with the actual situation of the coal mine,the engineering application is carried out through the example analysis method,and then it is confirmed that the improved multi population genetic algorithm has the advantages of fast rate of convergence,large energy saving and consumption reduction.