Correlation Analysis of Evaluation Indexes for Power Grid Production Projects
In response to the current situation where power grid production projects prioritize technology over economy,a quantitative correlation calculation model between input and output for production projects is established to achieve precise investment.Firstly,propose a process framework to analyze the correlation between production project indicators.Secondly,the production projects were classified and scaled,and the evaluation index system for the project was screened.Once again,a correlation degree calculation model for the evaluation indicators of power grid production projects was constructed based on the grey correlation method.Finally,conduct empirical analysis on production projects in a certain region to verify the accuracy and effectiveness of the proposed model method.
grid production projectevaluation indexgray correlationcorrelation degreeprecision investmentcalculation model