Optimization Design and Application of Rapid Quantitative Loading System for Coal Preparation Plant Trains
In order to improve the loading efficiency of the rapid quantitative loading system for trains,based on the current application status of the quantitative loading system in a certain unit,the main existing problems were analyzed.The structure and control system were mainly upgraded and transformed,and application tests were conducted.The results showed that the modified quantitative loading system no longer had the problem of chute icing affecting normal loading in low-temperature working environments.The problem of significant fluctuations in hydraulic oil temperature affecting shipment is no longer present,and remote monitoring of loading can be achieved,solving the problems of coal spraying and severe pollution,reducing the workload of operation and maintenance,reducing the labor intensity of workers,promoting the reduction of personnel and efficiency in loading work,achieving good economic and safety benefits.This can provide certain reference for the upgrading and transformation of rapid quantitative loading systems for trains under similar working conditions.