35 kV集电线路中间接头故障及解决措施研究
Research on Fault and Solution Measures of the Intermediate Joint in 35 kV Collecting Power Lines
许成龙 1张东岳 1王大可1
作者信息
- 1. 淄博齐林电力工程有限公司周村分公司,山东 淄博 255300
- 折叠
摘要
集电线路作为连接发电机与变电所、换流站等电网设施的输电线路,可将散乱的电能汇聚到一起,再完成向外传输.结合国内某风电场35 kV集电线路中间接头故障的典型案例,深入分析其故障现象及原因,并针对性地提出故障解决方案与预防措施,以进一步保证35 kV集电线路的运行可靠性,降低故障发生概率,保障电网的稳定运行.
Abstract
As a transmission line connecting generators to power grid facilities such as substations and converter stations,the collection line can gather scattered electrical energy together and then complete outward transmission.This paper combines a typical case of a 35 kV collector line intermediate joint fault in a domestic wind farm,deeply analyzes its fault phenomenon and causes,and proposes targeted fault solutions and preventive measures to further ensure the reliability of the 35 kV collector line operation,reduce the probability of fault occurrence,and ensure the stable operation of the power grid.
关键词
集电线路/输电线路/电网/中间接头Key words
collecting line/transmission line/power grid/intermediate joint引用本文复制引用
出版年
2024