首页|益阳电厂300 MW锅炉陶瓷板卫燃带的方案设计

益阳电厂300 MW锅炉陶瓷板卫燃带的方案设计

扫码查看
提供了益阳电厂300 MW锅炉陶瓷板卫燃带的4种设计方案,并从安全性、经济性、灵活适用性等3个方面进行最终比较,最后得出益阳电厂300 MW锅炉陶瓷板卫燃带的最佳设计方案.
Design of Ceramic Plate and Heat-Insulation Layer for 300 MW Boiler of Yiyang Power Plant
This paper provides four design schemes for ceramic boilers of 300 MW boiler in Yiyang power plant,and compares them from three aspects:Safety,economy,flexibility and applicability.Finally,the best design plan of 300 MW boiler's ceramic plate protection belt in Yiyang power plant is obtained.

boilerheat-insulation layerdesign scheme

刘俊

展开 >

长安益阳发电有限公司,湖南 益阳 413002

锅炉 卫燃带 设计方案

2024

自动化应用
重庆西南信息有限公司

自动化应用

影响因子:0.156
ISSN:1674-778X
年,卷(期):2024.65(15)