A mirror closed-loop testing system for substation control system renovation has been designed to address issues such as difficulty in power outage,short time for power outage debugging and acceptance,slow manual acceptance,and incomplete information verification.A mirror system is built for on-site operating equipment,using a mechanism of horizontal mirror comparison and vertical closed-loop verification.The automatic testing of the substation control system transformation is completed with a modular approach,and standardized test result reports are automatically generated.Moving the on-site manual verification process to the designed mirror closed-loop testing system in advance can effectively shorten the on-site power outage time,eliminate verification risks in advance,and improve the efficiency and quality of substation renovation.
关键词
变电站/站控系统/镜像闭环测试系统/模块化组件
Key words
substation/station control system/mirror closed-loop testing system/modular components