Due to the influence of line loss and equipment operation status,the operational performance of the line is low.Therefore,a study on the management,collection,operation and maintenance of synchronous line loss for 35 kV and above branch lines is proposed.Construct a sequence curve of influencing factors for synchronous line loss data of 35 kV and above branch lines,and adjust the corresponding state factor parameters based on the actual line loss data status.Starting from the perspectives of power lines,three-phase balance,and power load status,achieve defect elimination processing for data collection and operation.The results showed that the line loss power under the design method decreased by 80 MW,corresponding to a power factor of 0.95,and the line loss rate was only 20%,with a 3%reduction in voltage imbalance.
关键词
35/kV及以上分线/同期线损管理/数据状态/无功步长/三相平衡
Key words
35 kV and above branch lines/synchronous line loss management/data status/reactive power step size/three-phase balance