Optimisation and Operation and Maintenance Analysis of Fully Automated Coal Mining and Production Integration Systems
In order to further improve the operation efficiency and quality of the fully automatic mining and manufacturing integrated system,this paper is based on the structure and operation process of the current fully automatic sampling and sampling system,analyses its various problems,and provides targeted solutions to optimize the parameters of the devices in the existing system,and configure the new equipment to improve the sampling efficiency and ensure the accuracy of the data. The results show that the optimised system exhibits high accuracy and low offset characteristics,and the weighing error of the sample weight is within the acceptable range,the data offset is lower than 0.2%,and the precision is kept above 99.7%,which verifies the effectiveness of the optimised method.
coalfully automated coal mining and productionintegrated system