变电站是电力系统的重要组成部分,一次设备的安装调试质量直接关系到变电站的安全稳定运行.分析了变电站一次设备安装调试的重要意义和存在的问题,并从加强施工组织管理、优化安装工艺流程、强化安全质量控制、注重技术培训交底等方面提出了施工技术的改进对策.同时,结合变电站工程实例,分析与总结了相关施工技术.研究成果对提高变电站一次设备安装调试质量,保障电网长周期安全稳定运行具有重要参考价值.
Research on Installation and Commissioning Construction Technology of Primary Equipment in Power Engineering Substations
A substation is an important component of the power system,and the installation and commissioning quality of primary equipment is directly related to the safe and stable operation of the substation.This paper analyzes the important significance and existing problems of installation and commissioning of primary equipment in substations,and proposes improvement measures for construction technology from the aspects of strengthening construction organization management,optimizing installation process flow,strengthening safety and quality control,and emphasizing technical training and disclosure.At the same time,combined with examples of substation engineering,relevant construction techniques were analyzed and summarized.The research results have important reference value for improving the installation and commissioning quality of primary equipment in substations and ensuring the long-term safe and stable operation of the power grid.

substationprimary equipmentinstallation and commissioningconstruction technologypower grid safety

牛安、陆海波

展开 >

上海中智项目外包咨询服务有限公司,上海 201803

变电站 一次设备 安装调试 施工技术 电网安全

2024

自动化应用
重庆西南信息有限公司

自动化应用

影响因子:0.156
ISSN:1674-778X
年,卷(期):2024.65(z1)