首页|Multi-time Collaborative Restoration for Integrated Electrical-gas Distribution Systems Based on Rolling Optimization
Multi-time Collaborative Restoration for Integrated Electrical-gas Distribution Systems Based on Rolling Optimization
扫码查看
点击上方二维码区域,可以放大扫码查看
原文链接
国家科技期刊平台
NETL
NSTL
万方数据
This paper proposes a multi-time collaborative restoration model for integrated electricity-gas distribution sys-tems(IEGDSs)considering multiple resources after extreme weather events.Based on the linearized power flow constraints of the unbalanced electrical distribution system(EDS)and gas distribution system(GDS),this problem can be formulated as a mixed-integer linear programming(MILP)model.To improve the efficiency and veracity of the solution,a rolling optimiza-tion based two-stage method is developed with the first stage solved by a linear approximation model,and the second stage solved by real-time updated rolling optimization.By solving the MILP problem using rolling optimization,the proposed model and solution method achieve efficient and reliable collaborative restoration of IEGDS considering multiple resources and unbal-anced operation characteristics of EDS.The effectiveness of the proposed model and method is validated by using an IEGDS made of a 37-bus unbalanced EDS and 11-node GDS.
Electricity-gas systemmix-integer linear programmingpower system restoration
Jingyang Yun、Zheng Yan、Yun Zhou、Peichao Zhang、Weidong Hu
展开 >
Key Laboratory of Control of Power Transmission and Conversion of Ministry of Education,Department of Electrical Engineering,Shanghai Jiao Tong University
国家自然科学基金国家重点研发计划Science and Technology Project of State Grid Corporation of China