首页|全生命周期视角下加装电梯风险评估

全生命周期视角下加装电梯风险评估

Risk Assessment of Installing Elevators from a Full Lifecycle Perspective

扫码查看
为防范化解加装电梯风险,聚焦项目启动、设计规划、施工组织和运行维护等阶段,深入探讨各阶段风险诱因.通过实地走访和专家访谈,构建风险评估指标体系,运用层次分析法,评估加装电梯项目启动到投入运行的全过程风险.研究发现:项目能否顺利启动主要由经济因素决定;实地勘察对建设质量及使用安全起着决定性作用;施工组织和运行维护阶段的风险需要多主体协同治理.最后提出优化补助政策、搭建智慧平台、制定技术标准、鼓励科学研究等对策建议.
In order to prevent and resolve the risk of installing elevators,the paper focuses on the stages of project initiation,design planning,construction organization,operation and maintenance,and deeply discusses the risk inducements at each stage.Through on-site visits and expert interviews,a risk assessment index system was constructed,and the analytic hierarchy process was used to assess the risks of the whole process from the start to the operation of the elevator installation project.The results show that the smooth start of the project is mainly determined by economic factors.On-site investigation plays a decisive role in the quality of construction and the safety of use.The risks of construction organization and operation and maintenance need to be managed by multiple actors.Finally,some countermeasures and suggestions are put forward,such as optimizing the subsidy policy,building a smart platform,formulating technical standards,and encouraging scientific research.

Installing elevatorsFull lifecycleAnalytic hierarchy processRisk governance

张廷杰、张甜甜、邹皓

展开 >

四川省特种设备检验研究院 成都 610000

加装电梯 全生命周期 层次分析法 风险治理

2024

中国特种设备安全
中国特种设备检测研究中心 中国锅炉水处理协会 中国特种设备检验协会

中国特种设备安全

影响因子:0.28
ISSN:1673-257X
年,卷(期):2024.40(12)