In recent years,the problem of subsidence in mined-out area has brought great trouble to the design arrangement and safe and stable operation of belt conveyor.Based on the analysis of the causes of past failure cases and the new projects,this paper mainly introduces the design and other key points of the settlement column when the belt conveyor passes through the goaf.