Construction of the Program System in the JD Construction Stage
Program construction is a basic management work of nuclear power plant,scientific and reasonable procedure system can smooth the management channels,standardize the management process,guide the staff to perform their duties,to manage nuclear facilities in accordance with regulations at all stages of the design,con-struction and operation of nuclear power plants.As the operator and construction unit of a nuclear power plant,in order to effectively ensure that the work of the nuclear power project in all fields during the construction stage is carried out in an orderly manner,it is necessary to establish the corresponding management procedure system at the same time of implementing the pre-stage preparation and construction of nuclear power projects.By com-bing the upper-level documents,the framework of the procedure system and the verification activities of the management system,the overall goal of the procedure system construction of the new project is determined,in-troducing the phased program construction mode according to the routine stage of the early stage work of the nu-clear power project,formulating the program code and the program template,combing the program list of each stage,the overall control of program quality is carried out by means of three-level program review,quality engi-neer review,program progress tracking and program experience feedback,etc.,effectively completed the stage of the process system construction tasks,and for the follow-up of new nuclear power project procedures for the establishment of the system to provide reference.
segment modearchitecture building patternsprogram liststandardization of procedures