Study on Periodic Test Data Management in Nuclear Power Plant
Periodic test is a production activity for nuclear power plant to inspect the potential design functions defect of systems and equipment.It is required to be carried out according to the prescribed cycle.Only by con-ducting the test and passing the test results can one be confident that the design functions within the next cycle are reliable.Establishing a periodic test data management system for nuclear power plant can fully utilize the test data that is currently only saved in document format for equipment maintenance effectiveness evaluation and equipment reliability analysis management in power plants,improving the level of multi unit equipment manage-ment in nuclear power plants.