Development of Digital Production Scheduling System for Nuclear Power Plant
At present,telephone scheduling is widely used for production scheduling in the main control room of nuclear power plant.Under normal circumstances,it is difficult to carry out multiple businesses in parallel,which can easily cause operational blockages and equipment defects that cannot be dealt with in a timely man-ner.Therefore,there is an urgent need to develop a digital production scheduling system for nuclear power plant.By utilizing visualization and intelligent methods,combined with multi-media data transmission and arti-ficial intelligence technology,automatic data distribution can be achieved,and production standby personnel and relevant management personnel can be immediately reminded.The production scheduling instructions for emer-gency repair of defects,disaster events,and coordinated operation of the unit can be controlled throughout the entire process and all elements,forming a standardized control model for production scheduling,To achieve the goal of"customer-centered,data running,operator load reduction and response acceleration",achieve the"noti-fication of the main control room at most once",improve the refined management level of production scheduling in the main control room of nuclear power plant,and improve the safe operation efficiency of the unit.