Construction and Implementation of the Digital Maintenance Work Chain for Nuclear Power Plant Based on the Digital Work Package
A digital maintenance work chain construction plan was proposed by Fuqing Nuclear Power Plant for the first time,with the aim to take the lead in nuclear power operation performance.Based on the concepts of compliance,intensification,and efficiency,the top-level design is coordinated according to four levels and six principles.The construction of a digital maintenance work chain is carried out linked by digital work packages.Through the organic connection and efficient integration of the self built system of Fuqing Nuclear Power Plant and the unified construction system of China National Nuclear Power Co.,Ltd.,the data exchange barriers are broken,and the electronic process breakpoints between different business modules in the traditional maintenance work chain are connected.All business links that require manual and paper-based transmission are digitized and data-driven,achieving the digitalization and collaboration of the entire maintenance work chain.The electronic process breakpoints and data exchange barriers in the traditional maintenance work chain are broken.The compliance,standardization,personnel performance,and maintenance quality of the maintenance process provide an efficient and feasible case for solving the practical difficulties faced by frontline maintenance personnel,promoting technological innovation and fine optimization of management processes in enterprises.
maintenancework chaindigital work packagecollaboration