中国给水排水2025,Vol.41Issue(2) :75-81.DOI:10.19853/j.zgjsps.1000-4602.2025.02.012

工业新城基于WaterDesk的多水厂联合调度供水

Joint Scheduling of Water Supply for Multiple Waterworks Based on WaterDesk in a New Industrial City

廖晖 黄玲明 邓辉 汤敏
中国给水排水2025,Vol.41Issue(2) :75-81.DOI:10.19853/j.zgjsps.1000-4602.2025.02.012

工业新城基于WaterDesk的多水厂联合调度供水

Joint Scheduling of Water Supply for Multiple Waterworks Based on WaterDesk in a New Industrial City

廖晖 1黄玲明 1邓辉 1汤敏1
扫码查看

作者信息

  • 1. 湖南浏阳经开区水务股份有限公司,湖南长沙 410324
  • 折叠

摘要

为准确评估工业、居民混合用水高峰时供水管网的状况及多水厂联合调度的可行性,采用WaterDesk对长沙市某工业新城供水系统进行水力建模,并采用抄表数据、水厂瞬时供水量及现场实测数据对水力模型进行校准,校准后应用于现状工业企业与居民之间的用水矛盾分析,以及中区老旧水厂停产情况下供水用水存在问题的分析,并提出现状管网改造建议、多水厂联合调度模拟及拟建水厂的推荐位置和供水水压推荐值,可为管网改造、新建水厂提供参考.

Abstract

In order to accurately assess the condition of water supply pipelines during peak mixed industrial and residential water usage and the feasibility of multiple waterworks joint scheduling,a hydraulic model of a water supply system in a new industrial city in Changsha was established based on WaterDesk and calibrated using meter reading data,instantaneous water supply of waterworks,and on-site measured data.After calibration,the model was applied to analyze the water usage contradiction between existing industrial enterprises and residents,as well as to identify problems in the water supply system during the shutdown of old waterworks in central areas.Based on the analysis,pipeline modification,simulation of joint scheduling of multiple waterworks,locations for new waterworks,and water pressure values were proposed,which could provide guidance for pipeline modification and the construction of new waterworks.

关键词

WaterDesk软件/工业新城/供水管网/水力模型/多水厂联合调度

Key words

WaterDesk software/new industrial city/water supply network/hydraulic model/joint scheduling of multiple waterworks

引用本文复制引用

出版年

2025
中国给水排水
中国市政工程华北设计研究院 国家城市给水排水工程技术研究中心

中国给水排水

CSCD北大核心
影响因子:0.788
ISSN:1000-4602
段落导航相关论文