In order to solve the problem of insufficient cost control in pipeline engineering during the initial construction or bidding stage due to insufficient design depth,a municipal water supply and drainage engineering management method based on BIM secondary development technology is proposed.Using PKPM collision check and detail table functions,quickly generate a list of requirements for trench support components,and thus develop engineering design plans.The results indicate that the price for completing project construction has decreased by 257200 yuan compared to expectations.The overall ratio of the change cost price to the contract price has decreased by 14.84%.And the application of research methods has effectively saved the amount of municipal water supply and drainage engineering.This study provides theoretical value for similar cost management issues in the future.
关键词
BIM/PKPM/给排水工程/成本管理
Key words
BIM/PKPM/Water Supply and Drainage Engineering/Cost Control