Application of TRD Construction Method in Seepage Prevention Works of the Cofferdam of the Lower Reaches of Ganjiang River
TRD construction method is adopted for the anti-seepage wall construction of the four branches of the comprehensive renovation project of the lower reaches of Ganjiang River,and the construction technology is adjusted as per the important and difficult sections.This method overcomes the adverse factors such as complex geological conditions,large sand gravel formation thickness and deep anti-seepage wall.The construction efficiency is high and the construction is safe and environment friendly,and good anti-seepage effect has been achieved.
TRD construction methodcofferdamanti-seepage wallsand and gravel stratum