Analysis of key technical points of erection and construction of 35 kV high-voltage transmission lines
This paper focuses on the analysis of the application of 35 kV high-voltage transmission line wire erection construction technology,including preliminary preparation,foundation construction,tower construction,grounding construction and other contents.This paper comprehensively analyzes the crux factors of each key node,summarizes reasonable construction methods and quality control strategies according to specific project cases,and provides corresponding theoretical basis and operational guidelines for the construction quality and safety level of 35 kV high-voltage transmission line wire erection for the reference of relevant personnel.