现阶段,电力需求不断提升,火电站建设行业迅速发展。火电站规模较大,现有的火电厂工程建设一般通过EPC总承包的方式开展作业。该模式下,火电厂的建设作业一般承包给专业单位,使建设过程具备更强的专业性以及科学性,在保障建设质量的基础上加快作业效率,显著提升施工水平。然而,实际作业环节具有较强的技术性,而且流程较多,总承包模式的落实存在一些技术难点,一定程度上制约了总承包功能的发挥。基于此,对火电厂工程建设EPC总承包项目管理措施进行研究,以期保障总承包项目的顺利落实。
Thoughts on Management Measures of EPC General Contracting Project in Thermal Power Plant Engineering Construction
At present,the demand for electricity is constantly increasing,and the construction industry of thermal power plants is developing rapidly.Thermal power plants have a large scale,and the construction of existing thermal power plant projects is generally carried out through EPC general contracting.In this mode,the construction of thermal power plants generally transfers responsibility to professional units,making the construction process more professional and scientific.On the basis of ensuring construction quality,it accelerates work efficiency and significantly improves construction level.However,the actual homework process is highly technical and involves many processes.There are some technical difficulties in implementing the general contracting model,which to some extent restricts the full play of the general contracting function.Based on this,research is conducted on the management measures for EPC general contracting projects in thermal power plant engineering construction,in order to ensure the smooth implementation of the general contracting projects.

thermal power plantEPC general contractingproject management

张彬

展开 >

国能四川天明发电有限公司,四川绵阳 621700

火电厂 EPC总承包 项目管理

2024

中国科技纵横
中国民营科技促进会

中国科技纵横

影响因子:0.102
ISSN:1671-2064
年,卷(期):2024.(1)
  • 7