首页|地铁暗挖车站主体结构渗漏有效防治技术

地铁暗挖车站主体结构渗漏有效防治技术

扫码查看
近几年,随着社会经济的快速发展及交通建设的不断推进,各个城市的地铁暗挖车站需求日益增长。但是,受施工工艺等因素影响,一些地下暗挖车站出现了严重的地下渗漏水,如何有效提升地下暗挖车站的整体稳定性是一个迫切需要解决的问题。因此,在未来地铁暗挖车站主体结构施工中,应不断加强对各个渗漏问题的重视,并针对具体问题采用科学、合理的防治技术,不断完善地铁暗挖车站主体结构,避免在后期运行中出现渗漏。基于此,对地铁暗挖车站主体结构渗漏有效防治技术进行探讨。
Effective Prevention and Control Technology for Leakage of the Main Structure of Subway Underground Excavation Stations
In recent years,with the rapid development of the social economy and the continuous promotion of transportation construction,the demand for underground subway stations in various cities has been increasing.However,due to factors such as construction technology,some underground excavation stations have experienced serious underground water leakage.How to effectively improve the overall stability of underground excavation stations is an urgent problem that needs to be solved.Therefore,in the future construction of the main structure of subway underground excavation stations,attention should be continuously strengthened to various leakage problems,and scientific and reasonable prevention and control technologies should be adopted for specific problems to continuously improve the main structure of subway underground excavation stations and avoid leakage during later operation.Based on this,effective prevention and control technologies for leakage in the main structure of subway underground excavation stations are discussed.

subwayunderground excavation stationmain structureleakageprevention and control technology

周永娜

展开 >

中国水利水电第六工程局有限公司,重庆 400000

地铁 暗挖车站 主体结构 渗漏 防治技术

2024

中国科技纵横
中国民营科技促进会

中国科技纵横

影响因子:0.102
ISSN:1671-2064
年,卷(期):2024.(2)
  • 8