首页|悬索桥主缆架设空中纺丝法工艺试验研究

悬索桥主缆架设空中纺丝法工艺试验研究

扫码查看
悬索桥主缆架设空中纺丝法工艺是一种先进的桥梁建设技术,用于在悬索桥两座桥塔之间悬挂主缆。这一工艺经历了多次技术改进和实践验证,最终取得了显著的成就。基于此,对悬索桥主缆架设空中纺丝法的施工设备、施工原理进行分析,并详细阐述其工艺试验的内容,以期为我国桥梁建设提供更多选择和解决方案,为我国桥梁建设和交通运输事业的发展提供参考。
Study on Aerial Spinning Process for Main Cable Erection of Suspension Bridge
The aerial spinning method for installing the main cable of a suspension bridge is an advanced bridge construction technology used to suspend the main cable between two bridge towers.This process has undergone multiple technological improvements and practical verifications,ultimately achieving significant achievements.Based on this,the construction equipment and principle of the aerial spinning method for the installation of the main cable of the suspension bridge are analyzed,and the content of its process test is elaborated in detail.In order to provide more development options and solutions for bridge construction in China,and to provide reference for the development of bridge construction and transportation industry in China.

suspension bridgemain cable erectionair spinning methodprocess

张思敏

展开 >

西安中交一公院瑞通科研试验检测有限公司,陕西 西安 710075

悬索桥 主缆架设 空中纺丝法 工艺

2024

中国科技纵横
中国民营科技促进会

中国科技纵横

影响因子:0.102
ISSN:1671-2064
年,卷(期):2024.(4)