Application of Surface Grouting Reinforcement in the Treatment of Adverse Geological Conditions in Tunnel Construction
In response to the engineering geological problems such as rock fragmentation,faults,strong weathering and erosion,and dripping during the TBM excavation process of the second section of the water conveyance project of the Yinchuo Jiliao Project,comprehensive measures were taken to reinforce the surface grouting and strengthen the support inside the tunnel.The treatment effect was good,proving the feasibility of the plan,proving that this plan is feasible and can provide useful reference and inspiration for similar construction.