Three-dimensional stress variation characteristics in deep hard rock of CJPL-Ⅱ project based on in-situ monitoring

Minzong Zheng Shaojun Li Zejie Feng Huaisheng Xu Yaxun Xiao
矿业科学技术学报(英文版)2024,Vol.34Issue(2) :179-195.DOI:10.1016/j.ijmst.2023.12.007

Three-dimensional stress variation characteristics in deep hard rock of CJPL-Ⅱ project based on in-situ monitoring

Minzong Zheng 1Shaojun Li 2Zejie Feng 2Huaisheng Xu 2Yaxun Xiao2
扫码查看

作者信息

  • 1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071,China
  • 2. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071,China;University of Chinese Academy of Sciences,Beijing 100049,China
  • 折叠

Abstract

In deep hard rock excavation,stress plays a pivotal role in inducing stress-controlled failure.While the impact of excavation-induced stress disturbance on rock failure and tunnel stability has undergone com-prehensive examination through laboratory tests and numerical simulations,its validation through in-situ stress tests remains unexplored.This study analyzes the three-dimensional stress changes in the sur-rounding rock at various depths,monitored during the excavation of B2 Lab in China Jinping Underground Laboratory Phase Ⅱ(CJPL-Ⅱ).The investigation delves into the three-dimensional stress variation characteristics in deep hard rock,encompassing stress components and principal stress.The results indicate changes in both the magnitude and direction of the principal stress during tunnel exca-vation.To quantitatively describe the degree of stress disturbance,a series of stress evaluation indexes are established based on the distances between stress tensors,including the stress disturbance index(SDI),the principal stress magnitude disturbance index(SDIm),and the principal stress direction distur-bance index(SDId).The SDI indicates the greatest stress disturbance in the surrounding rock is 4.5 m from the tunnel wall in B2 Lab.SDIm shows that the principal stress magnitude disturbance peaks at 2.5 m from the tunnel wall.SDId reveals that the largest change in principal stress direction does not nec-essarily occur near the tunnel wall but at a specific depth from it.The established relationship between SDI and the depth of the excavation damaged zone(EDZ)can serve as a criterion for determining the depth of the EDZ in deep hard rock engineering.Additionally,it provides a reference for future construc-tion and support considerations.

Key words

Disturbance stress/Tensor distance/Stress disturbance index/Principal stress direction/Underground research laboratory

引用本文复制引用

基金项目

国家自然科学基金(42202320)

国家自然科学基金(42102266)

Open Project of Engineering Research Center of Phosphorus Resources Development and Utilization of Ministry of Education(LKF201901)

Yalong River Hydropower Development Co.,Ltd()