矿业科学技术学报(英文版)2024,Vol.34Issue(4) :427-442.DOI:10.1016/j.ijmst.2024.03.006

The influence of inter-band rock on rib spalling in longwall panel with large mining height

Jiachen Wang Meng Li Zhaohui Wang Zheng Li Han Zhang Shixiong Song
矿业科学技术学报(英文版)2024,Vol.34Issue(4) :427-442.DOI:10.1016/j.ijmst.2024.03.006

The influence of inter-band rock on rib spalling in longwall panel with large mining height

Jiachen Wang 1Meng Li 2Zhaohui Wang 1Zheng Li 3Han Zhang 2Shixiong Song2
扫码查看

作者信息

  • 1. School of Energy and Mining Engineering,China University of Mining and Technology-Beijing,Beijing 100083,China;Coal Industry Engineering Research Center of Top-coal Caving Mining,Beijing 100083,China
  • 2. School of Energy and Mining Engineering,China University of Mining and Technology-Beijing,Beijing 100083,China
  • 3. Faculty of Engineering,Hokkaido University,Sapporo 060-8628,Japan
  • 折叠

Abstract

In order to improve rib stability,failure criteria and instability mode of a thick coal seam with inter-band rock layer are analysed in this study.A three-dimensional mechanical model is established for the rib by considering the rock layer.A safety factor is defined foy the rib,and it is observed that the safety factor exhibits a positive correlation with the thickness and strength of the inter-band rock.A calculation method for determining critical parameters of the rock layer is presented to ensure the rib stability.It is revealed that incomplete propagation of the fracture at the hard rock constitutes a fundamental pre-requisite for ensuring the rib stability.The influence of the position of the inter-band rock in the coal seam on failure mechanism of the rib was thoroughly investigated by developing a series of physical models for the rib at the face area.The best position for the inter-band rock in the coal seam is at a height of 1.5 m away from the roof line,which tends to provide a good stability state for the rib.For different inter-band rock positions,two ways of controlling rib by increasing supports stiffness and flexible grout-ing reinforcement are proposed.

Key words

Rib spalling/Inter-band rock/Large mining height/Limit analysis/Physical model experiment/Numerical simulation

引用本文复制引用

基金项目

国家重点研发计划(2023YFC2907501)

国家自然科学基金(52374106)

中央高校基本科研业务费专项(2023ZKPYNY01)

出版年

2024
矿业科学技术学报(英文版)
中国矿业大学

矿业科学技术学报(英文版)

CSTPCDCSCDEI
影响因子:1.222
ISSN:2095-2686
参考文献量40
段落导航相关论文