Comprehensive treatment and transformation of wastewater in chlor-alkali production operation
The wastewater in the acetylene and vinyl chloride production plant area is collected and treated in a closed and centralized manner.The drainage system of the hazardous plant area and the sewage pipe network are treated with a water seal to prevent the backflow of the gas phase in the sewage pipe network.The concentrated sewage discharge treatment is set up for the storage area of acid-base ton barrels and the conversion wastewater to achieve the purpose of economic and stable operation.