首页|基于SWMM模型的海绵城市建设效果评估

基于SWMM模型的海绵城市建设效果评估

扫码查看
为定量评估广州市荔湖片区海绵城市建设成效,研究通过本底分析、资料收集等构建了片区排水分区尺度上的SWMM模型,并从年径流总量控制率、管网过流能力和内涝风险方面对广州市荔湖片区海绵城市建设效果进行了模拟分析,以期验证该区域按照海绵城市建设实施方案开发建设后,片区防灾减灾能力,同时本研究成果可为南方高密度地区海绵城市建设对缓解城市内涝提供理论参考.通过对广州市荔湖片区模拟计算得出主要结论如下:①广州市荔湖片区低影响开发建设后,年径流总量控制率显著提升,2022年片区年径流总量控制率为81.46%,较2019年低影响开发建设前提升了15.37%;②对广州市荔湖片区低影响开发建设前后排水管网过流能力模拟分析,结果表明片区在低影响开发建设前,在不同重现期降雨条件下,管网均出现溢流情况,且随着设计重现期的增大,管网溢流比例增加.片区低影响开发建设后,在不同重现期降雨条件下,管网溢流情况均明显降低;③对广州市荔湖片区低影响开发建设后内涝风险模拟分析,结果显示在发生百年一遇24 h降雨(累计降雨量322 mm)时,片区基本为无风险区域,极少部分为低风险区域,荔湖片区海绵城市建设后能有效应对百年一遇暴雨.广州市荔湖片区通过海绵城市建设可有效降低雨水外排,提升了片区防灾减灾能力.
Evaluation of Sponge City Construction Effect Based on SWMM Model
In order to quantitatively evaluate the effectiveness of sponge city construction in the Lihu area of Guangzhou,this study construct-ed a SWMM model at the scale of drainage zoning through background analysis and data collection.The simulation analysis of the sponge city construction effect in the Lihu area of Guangzhou was carried out from the aspects of annual runoff total control rate,pipe network overflow capacity,and waterlogging risk,in order to verify the disaster prevention and mitigation ability of the area after development and construc-tion according to the sponge city construction implementation plan.At the same time,the results of this study can provide theoretical refer-ence for sponge city construction in high-density areas in the south to alleviate urban waterlogging.The main conclusions drawn from simula-tion calculations of the Lihu area in Guangzhou are as follows:① After low impact development and construction,the annual runoff total con-trol rate in the Lihu area of Guangzhou has significantly increased.In 2022,the annual runoff total control rate in the area was 81.46%,which was 15.37%higher than that before the low impact development and construction in 2019;② The simulation analysis of the drainage network overflow capacity before and after the low impact development and construction in Lihu area of Guangzhou city shows that the area experienced overflow under different return periods of rainfall conditions before the low impact development and construction,and the over-flow ratio of the network increased with the increase of the design return period.After the low impact development and construction of the ar-ea,the overflow situation of the pipeline network was significantly reduced under different return periods of rainfall conditions;③ The simu-lation analysis of waterlogging risk after the low impact development and construction in Lihu District of Guangzhou City shows that the dis-trict is basically a risk-free area when the 24-hour rainfall with a 100 year return period(the accumulated rainfall is 322mm)occurs,and very few places are low-risk areas.The sponge city construction in Lihu District can effectively cope with the 100 year return period rain-storm.The construction of sponge cities in the Lihu area of Guangzhou can effectively reduce rainwater discharge and enhance the disaster prevention and mitigation capabilities of the area.

SWMM modelsponge cityeffect evaluationcapture ratio of total annual runoff volumeoverflow capacityLihu area

张沛林、杨建涛、王森、刘晋

展开 >

广州市增城区水务局,广东 广州 511300

珠江水利委员会珠江水利科学研究院,广东 广州 510611

水利部珠江河口治理与保护重点实验室,广东 广州 510611

SWMM模型 海绵城市 效果评估 年径流总量控制率 过流能力 荔湖片区

2025

中国农村水利水电
水利部中国灌溉排水发展中心 水利部农村水电及电气化发展局 武汉大学 中国国家灌溉排水委员会

中国农村水利水电

北大核心
影响因子:0.655
ISSN:1007-2284
年,卷(期):2025.(1)