中国铁道科学2024,Vol.45Issue(4) :99-110.DOI:10.3969/j.issn.1001-4632.2024.04.11

地铁车站矩形顶管壳-接头理论模型及纵向变形

Shell-Joint Theoretical Model and Longitudinal Deformation of Rectangular Pipe Jacking in Subway Station

许有俊 黄正东 张朝 李鹏飞 康佳旺 张旭 单余含
中国铁道科学2024,Vol.45Issue(4) :99-110.DOI:10.3969/j.issn.1001-4632.2024.04.11

地铁车站矩形顶管壳-接头理论模型及纵向变形

Shell-Joint Theoretical Model and Longitudinal Deformation of Rectangular Pipe Jacking in Subway Station

许有俊 1黄正东 2张朝 1李鹏飞 3康佳旺 1张旭 1单余含3
扫码查看

作者信息

  • 1. 内蒙古科技大学土木工程学院,内蒙古包头 014010;内蒙古科技大学矿山安全与地下工程院士专家工作站,内蒙古包头 014010;内蒙古自治区高校城市地下工程技术研究中心,内蒙古包头0140104
  • 2. 内蒙古科技大学土木工程学院,内蒙古包头 014010;内蒙古科技大学矿山安全与地下工程院士专家工作站,内蒙古包头 014010;内蒙古自治区高校城市地下工程技术研究中心,内蒙古包头0140104;北京工业大学城市与工程安全减灾教育部重点实验室,北京 100124
  • 3. 北京工业大学城市与工程安全减灾教育部重点实验室,北京 100124
  • 折叠

摘要

针对矩形顶管隧道易受影响产生纵向变形、进而引发接头破坏的问题,提出一种矩形顶管隧道壳-接头理论模型,并以此研究隧道在不均匀沉降作用下的纵向变形.首先,通过室内模型试验,探究矩形顶管隧道接头力学特性;其次,建立壳-接头理论模型,给出接头力学元件的刚度矩阵及其计算方法;然后,建立数值模型,并与室内模型试验结果进行对比;最后,依托20环管节的矩形顶管隧道工程实例,研究不均匀沉降作用下的隧道纵向变形.结果表明:接头破坏表现为闭合间隙、钢套环受力和变形破坏3个阶段,接头的抗剪和抗弯均由钢套环承担;壳-接头理论模型的模拟计算结果与模型试验结果较吻合,验证了模型的实用性和准确性;矩形顶管隧道的纵向变形受地基刚度影响显著,砾砂、粉砂和黏土3种地层对应的隧道最大附加沉降分别为3.72,7.66和12.14 mm,随着地基刚度的减小,隧道接头受不均匀沉降的影响将会增大.

Abstract

In response to the problem that rectangular pipe jacking tunnels are prone to produce longitudinal deformation,which can result in joint failure,a shell-joint theoretical model for rectangular pipe jacking tunnels is proposed,and the longitudinal deformation of tunnels under uneven settlement is examined.Firstly,indoor model tests are carried out to explore the mechanical properties of the joints in rectangular pipe jacking tunnels.Subsequently,the shell-joint theoretical model is established,and the stiffness matrix and computational methods for the mechanical elements of the joints are offered.Then,a numerical model is developed and compared with the results of the indoor model tests.Finally,relying on a case study of a rectangular pipe jacking tunnel with 20 segments,the tunnel's longitudinal deformation under uneven settlement is investigated.The results show that joint failure appears in three stages:closure of the gap,force and deformation failure of the steel sleeve ring,with the shear and bending resistance of the joints mainly borne by the steel sleeve ring.The simulation results of the shell-joint theoretical model are in line with the model test results,verifying the practicality and accuracy of the model.The longitudinal deformation of the rectangular pipe jacking tunnel is greatly affected by the stiffness of the foundation.The maximum additional settlements corresponding to the three soil types(gravel,silt,and clay)are 3.72 mm,7.66 mm,and 12.14 mm respectively.As the foundation stiffness decreases,the influence of uneven settlement on the tunnel joints will increase.

关键词

地铁车站/矩形顶管/壳-接头理论模型/地基刚度/隧道纵向变形

Key words

Subway station/Rectangular pipe jacking/Shell-joint theoretical model/Foundation stiffness/Tunnel longitudinal deformation

引用本文复制引用

基金项目

国家自然科学基金(51868062)

出版年

2024
中国铁道科学
中国铁道科学研究院

中国铁道科学

CSTPCDCSCD北大核心
影响因子:1.191
ISSN:1001-4632
参考文献量30
段落导航相关论文