Research on the Development Process of Scenic and Historic Area General Planning System
The scenic and historic area(SHA)general planning is the basic basis for their protection,utilization,and management.By sorting out the documents,regulations,and standards issued by the competent departments of the SHA since 1978 and comparing them with the results of the general regulations of the national SHA,it is divided into 5 periods:the preliminary drafting of general planning requirements,the legal foundation forming of the general planning system,the standardization of general planning and construction management,improvement of general planning supervision and regulatory system(divided into 2 stages:enhancing legal effectiveness and improving regulatory system),and the preservation and adjustment of the general planning system,and the phased and overall characteristics are summarized.This research analyzes the mutual promotion relationship between system formulation and practice,reveals the procedures of"preparation,approval-implementation,inspection-implementation evaluation"of the general regulations that have been formed,and shows the formation process of the basic contents,methods,and steps of the general regulations that guide"implementation and management"through"current situation investigation-resource evaluation-overall layout-special planning".
landscape architecturescenic and historic areageneral planning systemplanning compilationplanning history