中国医院建筑与装备2024,Vol.25Issue(11) :29-33.DOI:10.3969/j.issn.1671-9174.2024.11.005

医院大型医疗设备机房改造项目实践——以江西省某医院磁共振直线加速器机房为例

Hospital Large Medical Equipment Room Transformation Project Practice——Taking the MRI Linear Accelerator Room of a Hospital in Jiangxi Province as an Example

李江洱 徐炜妩 聂先亮
中国医院建筑与装备2024,Vol.25Issue(11) :29-33.DOI:10.3969/j.issn.1671-9174.2024.11.005

医院大型医疗设备机房改造项目实践——以江西省某医院磁共振直线加速器机房为例

Hospital Large Medical Equipment Room Transformation Project Practice——Taking the MRI Linear Accelerator Room of a Hospital in Jiangxi Province as an Example

李江洱 1徐炜妩 1聂先亮1
扫码查看

作者信息

  • 1. 南昌大学第一附属医院,南昌,330006
  • 折叠

摘要

以江西省某医院磁共振直线加速器机房改造项目为例,总结了医院大型医疗设备机房改造项目前期阶段、施工阶段的要点,为既有建筑改造为大型医疗设备机房提供了参考.

Abstract

This article takes reconstruction of the magnetic resonance linear accelerator room of a hospital in Jiangxi Province as an example.Summarized the main points of reconstruction and construction of large medical equipment room in hospital.It provides a feasible reference for transforming the existing building into a large medical equipment room.

关键词

大型医疗设备/机房改造/施工/磁共振直线加速器

Key words

Large medical equipment/Machine room renovation/Construction practice/Magnetic resonance linear accelerator

引用本文复制引用

出版年

2024
中国医院建筑与装备
卫生部医院管理研究所

中国医院建筑与装备

影响因子:0.304
ISSN:1671-9174
段落导航相关论文